Wednesday, 6 July 2011

It's a canoe - well it begins to look like one

After all the glueing chananigans It was time to start putting the pieces together.  I had decided to use cable ties.  The plan recommends every 200mm, so I did my sums, and decided 200 ties would suffice.  That forgets the number you mess up, break etc - so buy extra.  I used nearly 300 in total in the end.

In order to drill the holes for the cable ties I used a simple tool (which someone else on the web shows) which works well.  A stick with a nail in and a pencil - which are 200mm apart.  So you start in the centre mark, and move along.  This worked excellently, all the holes matched up perfectly, when drilled.

You can also see the scarf joints in the middle here





So starting with panels number 1, and working outwards, incorporate the mould panels as you go.  You will need to drill extra holes in the panels to hold the mould.

Do NOT be tempted to pull the ties tight yet, you will need all the flexibility you can get for sorting out the bow and stern
You see what I mean, there is a lot of pulling and bending to get these to marry together.

This was not helped by my bodging the pointy ends of the panels.  I had to cut and sand them to get them to pull together at the bow.  In the end I ended up snapping one of the number one panels completely.

I will have to find a way of fixing this later.
(Now decided - I will pack the inside with scrap wood, glue ply on the outside, and sand the lot to shape when it all sets up.)



Still, after much frustration I managed to get it all to come more or less into shape.

I suggest you think carefully about where you have the long ends of the cable ties, inside or out.  Out is easier for filleting later, but it means you have to have access to the underneath to pull them tight.

There were one or two issues from my decision to go to 4mm ply for the top 2 panels.  Namely that at the bow the step down from one thickness to the other was very noticeable, so I had to put an extra piece in the bow to even this out.

The thinner two planks also did not take on quite the same even curve as the thicker ply did.

Also it is key at this point to make sure the canoe is firmly wedged, and straight, so that it will not take on a skewed shape.  

So here is the final shape.

This fixing and fiddling was a good half days work, about 6 hours.

Time to actually get the epoxy out

In order to join each pair of panels I had decided to make a scarf joint 40mm long.  The recommended length I think is 60mm, but when I was practising on some scrap I found I could not get an even wedge shape over that great a distance, so 40mm was all I could manage.

The process is to clamp - and I also used panel pins - two panels on top of each other - but the top one is set back by 40mm.  Then set to with the belt sander.  Keep watch on the different coloured lines as they appear, try and keep them even on both panels.  Keep going until you have got an even wedge which goes 40mm back on both panels.

This took plenty of practice - and even then some were not too clever - this is one of the better ones

I was not too bothered, as the thickened epoxy will fill any imperfections, voids in the plywood which become apparent.

Then to make sure the scarf joints were glued correctly, both in the sense of the correct over lap, and that they need to exactly join so the plank has the correct, and matching curves, I did a lot measuring and marking on my bench.  I marked the 305mm spacing lines that were used for original points plotting onto the edges of all the sheets.  Then I marked on the bench the exact point (left and right of the centre point where the scarf joint is) of the 5th station, so when I laid a pair of panels end to end for glueing I could make sure that the centre, and the 5th station points were correct and I knew the final panel would be absolutely correct.
Finally, with layers of dustbin liner between I glued the panels together in pairs.  I used panel pins to nail then to a wood block, to hold them steady, put another block on top and clamped them together.
So I had five set of 4 metre panels with assorted clamps and blocks lying, curing on the floor.  So I thought.....

Sorry no pictures here I was to sticky and tired, and forgot.

You remember that discussion about using clear plastic pots to mix the epoxy, well, I decided to splash out and buy some pumps.  These are already set to give epoxy and hardner in the ratio of 5 : 1  (one pump on each gives the right ratio)  BUT I thought ( without reading the instructions ) 5 : 1 means 5 pumps and 1 pump.  I duly did this, added my wood filler, and silica, spread, nailed clamped etc.  Next day I cam back - and surprise NOT cured!   ( What an error for a Maths teacher)
After much scraping, and remixing, and renailing and re clamping I finally had 10 long sheets of plywood.

That lot took another day of about 8 hours, and about 2 hours the next day re-glueing.

So it begins

 First task is drawing out the co-ordinates from the plans details.  This was not made easier by my choice of going for 6mm and 4mm sheet plywood, each sheet cut into two halves.  The problem was that the co-ordinates for each point are given with reference to the bottom of a full sheet - so I had to subtract the width of half a sheet for the top two panels

I also made each panel 20mm longer so that I could make a 40mm scarf to joint the panels together.





Then using the ever flexible baton and some weights draw a smooth curve through each point.  I put a panel pin in at each point, and with some weights held the baton to the pin and drew in the curve







I suggest you pay great attention to the shape of the pointy (bow) end of each panel and transfer the points VERY carefully - as this will make pulling the bow panels MUCH easier later on ( I failed in this part - but more of that later on)


What I did (after all that adding and subtracting my brain was fully addled) is I transferred the wrong pointy bit to the panels.  When they did't quite fit I sort of drew them in by hand.........


Then comes the cutting out bit.  I cut all 4 sheets at the same time.  However I left too much gap from the line, which left a great deal of planing and sanding to be done.  So - cut as close to the line as you dare, with as fine a blade as you can get, and as slowly as you can to make sure the blade stays vertical and does not bend in the cut.

I held the panels tightly together with loadsa clamps





Finally to planing and sanding till you end up with 4 identical pieces of each panel.

I used firstly an electric plane, then a belt sander.  Again working with the sheets clamped together, flat on the work bench.  Do keep checking that the electric cutting edges are vertical - to keep the panel edges square.

This is where I paid for a little trust....

When I unclamped one of the 4mm panel sets it was obvious that I had a duff sheet of plywood - one just flexed and snapped in the middle, and one other was a bit weak.

Fortunately there was enough scrap, of good enough quality to draw round one that was good, and make a spare.

Learning point - inspect your plywood  VERY carefully, ALL over before buying.  It needs to be flat, with no thin regions, or knotty looking bits.

So at last I had 20 panels cut.

Total hours

To draw out and mark the panels was about 6 hours
To cut, plane, sand (and remake one) was one very long and dusty - day at 10 hours.

Saturday, 18 June 2011

Getting it Together

There's much to tell.

The midweek the box of epoxy and fillers came from mbfg.co.uk, and the two circular hatch covers for the bouyancy/ storage compartments in the bow and the stern.

I read through the plans and they sort of make sense.   After reading around I decided to go with 6mm plywood for the bottom 3 planks and 4mm for the top two.  I will not be sheathing the outside, as it will not be kept in the water, and will be stored indoors, hence the 6mm for added stiffness to the bottom).

Also from the plans I can see that the bottom three planks can be made from a 2' by 4' plywood panel, meaning I will need 4 each of 6mm and 4mm 2' x 8' sheets.  This has the added advantage that the narrower sheets fit inside the car - since it was pouring with rain that's a bonus.

Fortunately Leaders in Middlesbrough kindly cut 4' x 8' sheets down the middle for me.  Cost for these sheets was £40 cash

I also picked up a few useful bits from B&Q, like paint brushes, small rollers, dust mask, cable ties etc - £30







That means I need to tidy the workshop up after the last project (a welsh dresser for the finance minister)

And sort out what I will need for this project.

So including the the stuff I have got left over from previous builds this is what I have set up to use






Clamps, both G type, and 2 bags of those plastic squeeze open ones which ALDI were selling off for £4 for 20

Also some of the electric tools I expect to need, drill, jigsaw, heat gun to heat plywood if it gets cold to aid penetration of epoxy, belt sander, circular saw.





Some consumables, I will mark up some plastic transparent cups with 5:1 measures for the epoxy, and mix using disposable teaspoons, some metal trays for rollering on clear epoxy, plastic gloves (loads of them) cable ties for the stitch and glue.

Hint - when marking measuring cups - put one cup inside another.  Using water - measure in the amount you might want in epoxy into the INSIDE cup, and mark the level on the OUTSIDE cup.  Then add to the inside up the correct volume for the hardner and mark that on the outside.  Do this with several different OUTSIDE cups, using different volumes.  Then when you want to use your epoxy choose the correct outside cup for the amount you want to make, put another one inside it, and pout in the resins up to the lines on the outside cup.

Note the roll of brown parcel tape - I intend to put this down on my benches when glueing the scarf joints - so they don't stick to the bench, as the epoxy will not stick to the polyester tape.

Safety gear, goggles, ear defenders, heavy duty - ish face mask for the sanding stage


Also a pack of cheap paint brushes - 10 for £6 from B&Q















Materials purchased - epoxy and fillers













Lastly a selection of standard woodworking tools - on a now TIDY - ish work bench (note the pile of ' it'll come in handies' under the bench - that's all offcuts from making the welsh dresser)














Searching on the web for how to scarf the middle joints I came across a website (http://www.oneoceankayaks.com/stitchglue/plyshophtm/scarfjig2.htm) which described a jig to use a circular saw to make scarf joints.  The example was using thicker ply than I am going to.  I found that my circular saw had too coarse a blade a ripped out the thin ends of each scarf - So I have decided to make the scarf joints using the belt sander - practice strips initially look good.

So I can now see how most of the tasks will be completed.

Now outstanding - shall I put a keel on ?  both to help make it run straighter, and for protection, but it's more work, and weight....  decisions, decisions.....

What shape paddles to build?

More information on how the scarf practice joints work out in the next instalment.

AJWM

Sunday, 12 June 2011

The Plan arrives

So it begins.  I will try and keep this costed and timed for those that wish to follow

Plans ordered from Selway :-  Hazelnut plans
48 GBP including postage


Epoxy 106 and fillers (colloidal silcas for stiffening and microfibres for keeping joints wet and stiffening and colouring) ordererd from MD  fibreglass   http://www.mbfg.co.uk/epoxy-resins/1742.html
75 GBP (Including postage)

I already have stuff like mixing pots, and some tape, gloves etc from previous builds

I may need some more tape for the seams.

I have not yet decided if I wish to sheath the outside - so no cloth has yet been ordered


Also ordered two round hatch covers for the buoyancy chambers from ebay (total 9GBP icluding postage)

AJWM